UndergroundInternationalGeneralInitial and Final Shotcrete Linings for Edouard Montpetit Station of REM Project – 2024 Honorable Mention Project
Verya Nasri
Read MoreR.seau Express M.tropolitain (REM) is an automated (driverless) light-rail transit (LRT) system in Montreal, Canada. It features 67 km (42 mi) of double tracks and 26 stations. Once completed, it will be the 4th longest automated LRT transportation system in the world.
RepairStructuralGeneralGoose Pond Dam Improvements – 2024 Honorable Mention Project
George Machikas
Read MoreThe rehabilitation of the Goose Pond Dam was initiated by the New Hampshire Department of Environmental Services to address significant leaking of the dam that threatened multiple downstream towns. Improvements included flattening the downstream slope, updating and improving the seepage collection system along the downstream toe of the dam…
ArchitecturalStructuralGeneralSlope Stabilization in Kicking Horse Canyon – 2024 Honorable Mention Project
Dan Pitts
Read MoreThe Kicking Horse Canyon Highway, part of the Trans-Canada Highway near Golden, British Columbia, has a rich history tied to the region’s rugged geography and vital transportation needs. Originally a narrow and winding route carved into the steep canyon walls, it was built in the early 1900s to connect
RepairStructuralGeneralIce Harbor Dam Rewinds and Turbine Runner Replacement – 2024 Outstanding Infrastructure Project
David Graham
Read MoreIce Harbor Lock and Dam was authorized by the River and Harbor Act of 1945. Constructed in 1956, the project includes a dam, a powerhouse, a navigation lock, two fish ladders, a removable spillway weir, and a juvenile fish bypass facility. It provides navigation, hydropower, flood risk management, fish and
RepairInternationalGeneralModernization of the Water Treatment Plant in Poznan – 2024 Outstanding International Project
Wlodzimierz Czajka
Read MoreAccording to the available documentation, the Iron Removal Building and the Rapid Filter Building were both put into operation in 1943, built mainly by prisoners of war from various nations.
PoolGeneralBoundless Waters – 2024 Outstanding Pool & Recreational Project
Bill Drakeley & Anna Drakeley
Read MoreThe Boundless Waters pool project is a contracted water feature that draws its contemporary design from the architecture of the new house installation. The house is a modern version of the old costal mansions once built and adorned on the Hudson River by the Rockefellers, Morgans, and Vanderbilts.
RepairGeneralHemlock Reservoir Dam Improvements – 2024 Outstanding Rehabilitation & Repair Project
George Machikas
Read MoreThe Aquarian Water Company of CT authorized the repair and resurfacing of the Hemlock Dam. The dam, commissioned in 1928, is about 2 mi (3.2 km) from Fairfield, CT. Size is approximately 1100 ft (340 m) long and 75 ft (23 m) high.
UndergroundGeneralAnderson Dam Tunnel – 2024 Outstanding Underground Project
Brian Harris, PE, and Alex Folchi, PE
Read MoreDrill Tech Drilling & Shoring, Inc. performed Sequential Excavation Method (SEM) tunnel construction with geometric cross sections consisting of 19 ft to 24 ft (5.6 to 7.3 m) diameter tunnels (including wide span intersections) for the Anderson Dam Tunnel Project.
GeneralA Retrospective: The American Shotcrete Association
Ted Sofis
Read MoreThe ASA was and is largely a collective effort. I am very proud of our organization and of all that we have achieved in roughly a 25-year span of time.
ArchitecturalSkateparksGeneralAn Intersection of Art and Engineering in Shotcrete
Jasper Kahn
Read MoreRosado-Seijo and Kwade’s sculptures stand as a testament to the power of collaboration between artists and shotcrete specialists, exemplifying the possibilities that arise when creative artistic vision meets shotcrete’s technical capability.