According to the available documentation, the Iron Removal Building and the Rapid Filter Building were both put into operation in 1943, built mainly by prisoners of war from various nations.
Boundless Waters – 2024 Outstanding Pool & Recreational Project
The Boundless Waters pool project is a contracted water feature that draws its contemporary design from the architecture of the new house installation. The house is a modern version of the old costal mansions once built and adorned on the Hudson River by the Rockefellers, Morgans, and Vanderbilts.
Hemlock Reservoir Dam Improvements – 2024 Outstanding Rehabilitation & Repair Project
The Aquarian Water Company of CT authorized the repair and resurfacing of the Hemlock Dam. The dam, commissioned in 1928, is about 2 mi (3.2 km) from Fairfield, CT. Size is approximately 1100 ft (340 m) long and 75 ft (23 m) high.
Anderson Dam Tunnel – 2024 Outstanding Underground Project
Drill Tech Drilling & Shoring, Inc. performed Sequential Excavation Method (SEM) tunnel construction with geometric cross sections consisting of 19 ft to 24 ft (5.6 to 7.3 m) diameter tunnels (including wide span intersections) for the Anderson Dam Tunnel Project.
On-line pre-registration is now closed. Onsite registration will be available onsite starting Sunday, March 9th.
Time | Event | Location |
---|---|---|
8:00 AM – 4:00 PM | Contractor Qualification Education: Pool (NEW!) | Pulaski |
8:00AM – 4:00 PM | Contractor Qualification Education: Structural Levels I & II | Pulaski |
4:00 PM-6:00 PM | Exams for Contractor Qualification: Structural and Pool (NEW!) | Pulaski |
6:45 PM-9:00 PM | ASA Registration | Madison |
7:00 PM-9:00 PM | Welcome Reception & Exhibitor Showcase | Madison |
Time | Event | Location |
---|---|---|
7:00 AM – 8:00 AM | ASA Registration | Madison |
7:00 AM – 8:00 AM | Breakfast & Exhibitor Showcase | Madison |
8:00 AM – 9:00 AM | Blue Plains DC – Worlds largest WTP- Sewpercoat Rehabilitation & Dry Mix Method | Cumberland |
8:00 AM – 9:00 AM | Aggregate Selection in Shotcrete Mix Design: Dry-Mix Process When Volumetric Batching | Sapelo |
9:00 AM – 10:00 AM | Advancements in Shotcrete Equipment Technologies for the Underground Hardrock Mining Industry | Cumberland |
9:00 AM – 10:00 AM | Commercial Pools Using Shotcrete
| Sapelo |
10:00 AM – 10:30 AM | Break & Exhibitor Showcase | Madison |
10:30 AM – 11:30 AM | Low Carbon Sustainable Shotcrete Linings in Underground Infrastructure
| Cumberland |
10:30 AM – 11:30 AM | Avoiding Litigation in Pool Construction | Sapelo |
11:30 AM-1:30 PM | Lunch & Exhibitor Showcase | Madison |
12:30 PM-1:30 PM | Membership & Marketing Committee | Ossabaw |
1:30 PM-2:30 PM | Underground Committee | Ossabaw |
2:30 PM-3:00 PM | Break & Exhibitor Showcase | Madison |
3:00 PM-4:00 PM | Pool & Recreational Shotcrete Committee | Ossabaw |
4:00 PM-5:00 PM | Contractor Qualification Committee | Ossabaw |
5:30 PM-6:30 PM | ASA Networking Reception | 1540 Room |
7:00 PM-8:30 PM | ASA Networking Dinner | 1540 Room |
Time | Event | Location |
---|---|---|
7:00 AM-8:00 AM | ASA Registration | Madison |
7:00 AM – 8:00 AM | Breakfast & Exhibitor Showcase | Madison |
8:00 AM-9:00 AM | Education & Safety Committee | Ossabaw |
9:00 AM – 11:30 AM | Board of Directors Meeting | Ossabaw |
10:00 AM – 10:30 AM | Break & Exhibitor Showcase | Madison |
11:30 AM-1:30 PM | Lunch & Exhibitor Showcase | Madison |
12:30 PM-1:30 PM | Planning and Executing a Shark Dive, No Different than a Tunnel Project? | Cumberland |
12:30 PM-1:30 PM | Strategic Shotcrete Application – WWTP Trickling Filter Restoration | Sapelo |
1:30 PM-2:30 PM | Guide to the Care and Feeding of Your Engineer on Shotcrete Projects | Cumberland |
1:30 PM-2:30 PM | Shotcreting & Waterproofing works at building, Multifaceted Conference Centre at Brigade Tech Garden, Whitefields, Bengaluru, India | Sapelo |
2:30 PM-3:00 PM | Break & Exhibitor Showcase | Madison |
3:00 PM-4:00 PM | Natural Fibers for Sustainability in Shotcrete Applications | Cumberland |
3:00 PM-4:00 PM | Inspection of Shotcrete Delivery System | Sapelo |
6:00 PM – 7:00 PM | Outstanding Shotcrete Project Awards Reception | Harborview |
7:00 PM – 10:00 PM | Outstanding Shotcrete Project Awards Ceremony & Banquet | Harborview |
A Retrospective: The American Shotcrete Association
The ASA was and is largely a collective effort. I am very proud of our organization and of all that we have achieved in roughly a 25-year span of time.
An Intersection of Art and Engineering in Shotcrete
Rosado-Seijo and Kwade’s sculptures stand as a testament to the power of collaboration between artists and shotcrete specialists, exemplifying the possibilities that arise when creative artistic vision meets shotcrete’s technical capability.
The Diversity of Shotcrete
It is truly paramount to recognize the diversity of solutions available because of the versatility that shotcrete offers. Shotcrete placement provided more efficient, sustainable and durable concrete solutions in these two cases than could have been achieved with a form-and-pour approach.
Relieving Water Pressure on Shotcrete Lining by Integrating a Drainage Mesh
Underground construction, especially a tunnel, is one of the most complex challenges in the field of civil engineering. Dolenco Drain is an innovative solution which addresses many of the difficulties with controlling or eliminating water pressure in an easy, safe, long-term, and cost-effective manner.
Early Age Strength Testing for Shotcrete: 2024
For improved safety in tunneling and mining projects that use shotcrete for ground support, early shotcrete strength should be evaluated by testing. Based on their range of effectiveness, two procedures stand out: The new Hilti BX 3-SCT stud driving method and the beam end tester.