Anderson Dam Tunnel – 2024 Outstanding Underground Project

Drill Tech Drilling & Shoring, Inc. performed Sequential Excavation Method (SEM) tunnel construction with geometric cross sections consisting of 19 ft to 24 ft (5.6 to 7.3 m) diameter tunnels (including wide span intersections) for the Anderson Dam Tunnel Project.

Relieving Water Pressure on Shotcrete Lining by Integrating a Drainage Mesh

Underground construction, especially a tunnel, is one of the most complex challenges in the field of civil engineering. Dolenco Drain is an innovative solution which addresses many of the difficulties with controlling or eliminating water pressure in an easy, safe, long-term, and cost-effective manner.

Early Age Strength Testing for Shotcrete: 2024

For improved safety in tunneling and mining projects that use shotcrete for ground support, early shotcrete strength should be evaluated by testing. Based on their range of effectiveness, two procedures stand out: The new Hilti BX 3-SCT stud driving method and the beam end tester.

The Rondout Bypass Tunnel Shafts – Shotcrete Lining

The Rondout-West Branch Tunnel (RWBT), a segment of the Delaware Aqueduct (the Aqueduct), was built from 1937 to 1944 and provides about 50% of New York City’s total water supply. The tunnel is concrete lined and has a finished inside diameter of 13.5 ft (4.1 m). It is about 45 mi (72 km) in length and runs in the southeasterly direction from the Rondout to the West Branch Reservoirs.