The Wright Memorial Bridge has served as the gateway to the sunny beaches of the iconic Outer Banks of North Carolina for millions of vacationers since 1930.
ICRI: 30 Years and Getting Stronger
The lack of standards and undertrained professionals are two factors that were key to the formation of the International Concrete Repair Institute, or as it is better known, ICRI.
Swimming Pool Renovation with Shotcrete
The major renovation of a pool structure is never an easy undertaking. Determining the quality of the in-place concrete is an art in and of itself.
Compatible Shotcrete Specifications and Repair Materials
Concrete repair projects can often be completed using a variety of different repair materials and methods, though in some cases, the specific performance requirements of a project may dictate use of a specific material or method.
The Outstanding Repair & Rehabilitation Project
Honorable Mention
Shotcreting the East Side Access Program
Prior to 9/11, all structural wall and tunnel concrete applications in New York, NY, used the form-and-pour concrete placement method.
Shotcrete Use in the Gold King Mine Rehabilitation
The Gold King Mine Level 7 Portal is located at elevation 11,438 ft (3486 m) on the North Fork of Cement Creek, approximately 8 miles (13 km) north of Silverton, CO.
Creating a Foundation for Success: The Use of Lidar in Tunneling Projects
Shotcrete placement requires close attention to safety; when combined with the difficult working conditions of a tunnel, overhead placement requires even greaterawareness of potential hazards.
Simple Still Works
Coastal Gunite Construction recently executed a few phases of a storm sewer rehabilitation in a line running under the Blue Plains Advanced Wastewater Treatment Plant operated by the District of Columbia Waterand Sewer Authority.
