Back to: Articles Search

Article

RepairUndergroundStructuralThe Rondout Bypass Tunnel Shafts – Shotcrete Lining

Paul Madsen, Bade Sozer, Thomas Hennings, & Eileen Test

Read More

The Rondout-West Branch Tunnel (RWBT), a segment of the Delaware Aqueduct (the Aqueduct), was built from 1937 to 1944 and provides about 50% of New York City’s total water supply. The tunnel is concrete lined and has a finished inside diameter of 13.5 ft (4.1