Back to: Articles Search

Article

UndergroundInternationalJob Report on Hydropower Station in Stanzertal, Austria

Sascha Schreiner

Read More

It is remarkable that three different tunnelbuilding methods are being used on this hydropower station construction site: excavator, drill and blast, and tunnel boring machine (TBM) advancement.