Article
ArchitecturalStructuralASANTE
2008 Outstanding Architectural Project
Read MoreThe ASANTE project consisted of six aqueduct structures, two sign walls, and a faux bridge that was actually two massive retaining walls.
2008 Outstanding Architectural Project
Read MoreThe ASANTE project consisted of six aqueduct structures, two sign walls, and a faux bridge that was actually two massive retaining walls.