ASA’s Contractor Qualification Program

As 2018 begins, the ASA Contractor Qualification Committee is putting the final touches on the Contractor Qualification program slated to premier this spring.

Hydro-Mix Nozzle Setups

Hydro-mix and predampening nozzle options have been around for many decades?some dating back to the original cement gun company days.

The History of Shotcrete Equipment

Transcrete specialized in building pumps for highrise buildings and large concrete placements. The concrete used on these projects was normally low-slump, high-strength mixtures.

Responding to an OSHA Inspection

Whether an OSHA inspection of your workplace or construction site is triggered by a workplace injury, a formal complaint, a programmed wallto- wall inspection, or just a spot decision while OSHA happens to drive by your construction site, being preparedbeforehand will help limit exposure and help defend against any citations that may be issued.

Chemistry and Heat Treatment

If you stop and take a look around your shop at your equipment and tools, and maybe the walls and beams of the building itself, you are bound to see dozens or hundreds of individual metal components.