The New York City Transit (NYCT) Metropolitan Transportation Authority Capital Construction (MTACC) has several largescale projects throughout New York, including one major program: the East Side Access project.
The Durability of Shotcrete? Looking Back at Projects from 30 to 40 Years Ago
Anyone who has ever had to remove old gunite from a bridge or an overpass knows how incredibly difficult it can be to tear out.
The Outstanding Infrastructure Project
The Outstanding Repair & Rehabilitation Project
Project Name:
Société de transport de Montréal – Metro Yellow Line Tunnel Repairs
Location:
Montréal, QC Canada
Shotcrete Contractor:
Construction Interlag Inc
Architect/Engineer:
Société de transport de Montréal
Material Supplier/Manufacturer:
King Shotcrete Solutions
General Contractor:
Construction Interlag Inc
Project Owner:
Société de transport de Montréal
The Outstanding Underground Project
Honorable Mention
Cadia East Project
The Cadia East Project is delivering what will become the largest underground mine in Australia and one of the largest underground gold mines in the world (Cadia East).
Considerations for Underground Training
The growing demand for increasingly complex and adaptable urban infrastructure has caused developers to turn an eye to shotcrete as the most economically viable, technically flexible, and structurally sound construction method.
Pedestrian Tunnel at Billy Bishop Toronto City Airport
In early 2012, construction began on an underwater pedestrian tunnel that will link Billy Bishop Toronto City Airport to the mainland in Toronto, ON, Canada.
Ultra Rapid Strength Development in Dry-Mix Shotcrete for Ultra Rapid Support in Challenging Mining Conditions
Recent developments in the field of cementing materials have brought forward many nontraditional binder systems.