
Math, Science & Shotcrete – 2024 Outstanding Architecture | New Construction Project
The repair was at a Middle School in Holly Springs, NC. Summer break had already started, so the situation was urgent: They needed a solution before school started back up, as one of the challenges included repair locations not just on campus but directly adjacent to class rooms.
Shotcrete and Waterproofing Works Multifaceted Conference Centre at Brigade Tech Gardens – 2024 Honorable Mention Project
Brigade Tech Gardens Whitefield is a Grade A project featuring a total development of 3.3 million square feet (310,000 square meters) spread across 26 acres (10 hectares). The commercial project is in the middle of Bengaluru’s IT corridor in Whitefields, Bengaluru, India.
Initial and Final Shotcrete Linings for Edouard Montpetit Station of REM Project – 2024 Honorable Mention Project
R.seau Express M.tropolitain (REM) is an automated (driverless) light-rail transit (LRT) system in Montreal, Canada. It features 67 km (42 mi) of double tracks and 26 stations. Once completed, it will be the 4th longest automated LRT transportation system in the world.
Goose Pond Dam Improvements – 2024 Honorable Mention Project
The rehabilitation of the Goose Pond Dam was initiated by the New Hampshire Department of Environmental Services to address significant leaking of the dam that threatened multiple downstream towns. Improvements included flattening the downstream slope, updating and improving the seepage collection system along the downstream toe of the dam…
Slope Stabilization in Kicking Horse Canyon – 2024 Honorable Mention Project
The Kicking Horse Canyon Highway, part of the Trans-Canada Highway near Golden, British Columbia, has a rich history tied to the region’s rugged geography and vital transportation needs. Originally a narrow and winding route carved into the steep canyon walls, it was built in the early 1900s to connect the mountainous interior of British Columbia with the rest of Canada.
Ice Harbor Dam Rewinds and Turbine Runner Replacement – 2024 Outstanding Infrastructure Project
Ice Harbor Lock and Dam was authorized by the River and Harbor Act of 1945. Constructed in 1956, the project includes a dam, a powerhouse, a navigation lock, two fish ladders, a removable spillway weir, and a juvenile fish bypass facility. It provides navigation, hydropower, flood risk management, fish and wildlife habitat, recreation, and incidental irrigation.
Modernization of the Water Treatment Plant in Poznan – 2024 Outstanding International Project
According to the available documentation, the Iron Removal Building and the Rapid Filter Building were both put into operation in 1943, built mainly by prisoners of war from various nations.
Boundless Waters – 2024 Outstanding Pool & Recreational Project
The Boundless Waters pool project is a contracted water feature that draws its contemporary design from the architecture of the new house installation. The house is a modern version of the old costal mansions once built and adorned on the Hudson River by the Rockefellers, Morgans, and Vanderbilts.
