The updated fiber-reinforced shotcrete testing standard in underground projects provides not just significant cost savings, but just as critical, helps us to significantly reduce the carbon impact of the underground construction industry and provide for a better environment and future for us all.

Registration is open!
Resort Information
Inspired by the charm and energy of Savannah’s Historic District, The DeSoto’s newly renovated space blends classic elegance and modern hospitality with magnificent city views. The DeSoto blends the elegance, history, and charm of one of America’s oldest cities with a playful dose of Southern spirit. Explore Savannah’s favorite hotel!
The DeSoto
15 East Liberty Street,
Savannah, GA 31401
2025 Call For Presentations – are now closed
Thank you for your submissions. Look for registration to open at the end of October.
Past Conventions
Take a look at the schedules, photos, and sponsors of our pat conventions.
Guide to ACI Shotcrete Documents
This form is currently closed for submissions.
This form is currently closed for submissions.
We are a shotcrete company in Southern California, and I have a technical question about an issue that has recently come up. Is there any official ASA or ACI guide/spec that recommends or lays out the use of a certified nozzleman on a job that he was not “job site” approved for? For instance, a nozzleman who did not shoot a test panel was overseen by the approved nozzleman for that job site. I understand that the approved nozzleman can oversee another ACI-certified nozzleman on the job so that he can rest and oversee production. Seeing as the approved man is overseeing the nozzleman, is it the same as him shooting the wall himself?
It appears you are talking about a nozzleman who has not been pre-qualified by shooting a mockup panel on a specific project. There is no official ASA or ACI document that addresses this issue. However, this situation is similar to what ACI guidance provides regarding ACI-certified Shotcrete Nozzlemen and Nozzlemen-in-training. ACI’s Certification Program Policy for Shotcrete Nozzleman and Nozzleman-In-Training Section 1.04 states: “ACI Shotcrete Nozzleman-In-Training (NIT) certification is available to applicants who do not possess 500 hours of work experience but do possess a minimum of 25 hours of hand nozzling work experience in the process being sought (vertical orientation only). The examiner of record may require an ACI-certified nozzleman to be present during the performance exam; however, the ACI-certified nozzleman’s interaction with the examinee is strictly limited to the safety of the shooting operation.”
We are having a pool installed and would like to know if shotcrete should be placed when severe weather is forecasted for late in the day or the next day? Is it possible to cover the area after application to protect it?
Shotcrete is a method for placing concrete. Concrete has a set time that provides hardness of the in-place concrete. Final set may take anywhere from an hour to several hours depending on the concrete mixture and the weather.
Hot weather has a faster set time than cold weather with the same concrete mixture. If the pool is shot in the morning, it may be hard enough to tolerate a rainstorm in the late afternoon. The concrete should certainly be set by the next day unless there is a very cold overnight temperature or a problem with retarder in the concrete mixture. Tarps could be placed over the vertical walls to protect them from a sudden rainstorm. The floor may be harder to protect as the rainwater wouldn’t necessarily drain off the floor.
If concrete is exposed to rain and the surface isn’t washed off in any way, the concrete should be good. Similarly, if you are expecting freezing temperatures overnight, the fresh concrete must be protected from freezing. This may require using vented heaters and insulated blankets. The goal of the cold weather protection is to keep the surface temperature of the fresh concrete above 50°F (10°C). More details on cold weather protection can be found in ACI PRC-306-16 Guide to Cold Weather Concreting available directly from ACI’s bookstore (concrete.org/store.aspx).