Back to: Articles Search

Article

UndergroundEncapsulation of Reinforcement in Tunnel Shotcrete Final Linings

Position Statement #3 ASA Underground Committee

Read More

Using shotcrete for the placement of concrete for tunnel final linings is becoming more common. In the past the use of shotcrete final linings was typically limited to non-public or emergency egress areas, however, shotcrete is being used more and more in public areas. The use of shotcrete is typically an attractive alternative to form-and-pour final lining installation where formwork costs are high or technically challenging, pose a scheduling issue, or where labor rates are very high. Typical examples for successful use of shotcrete final linings are complex lining geometries, intersecting or merging tunnels, widenings, short tunnels without sufficient repeating utilization of the forms, or underground systems where formwork would block passing traffic.