Goose Pond Dam Improvements – 2024 Honorable Mention Project

The rehabilitation of the Goose Pond Dam was initiated by the New Hampshire Department of Environmental Services to address significant leaking of the dam that threatened multiple downstream towns. Improvements included flattening the downstream slope, updating and improving the seepage collection system along the downstream toe of the dam…

Slope Stabilization in Kicking Horse Canyon – 2024 Honorable Mention Project

The Kicking Horse Canyon Highway, part of the Trans-Canada Highway near Golden, British Columbia, has a rich history tied to the region’s rugged geography and vital transportation needs. Originally a narrow and winding route carved into the steep canyon walls, it was built in the early 1900s to connect the mountainous interior of British Columbia with the rest of Canada.

The Diversity of Shotcrete

It is truly paramount to recognize the diversity of solutions available because of the versatility that shotcrete offers. Shotcrete placement provided more efficient, sustainable and durable concrete solutions in these two cases than could have been achieved with a form-and-pour approach.

Early Age Strength Testing for Shotcrete: 2024

For improved safety in tunneling and mining projects that use shotcrete for ground support, early shotcrete strength should be evaluated by testing. Based on their range of effectiveness, two procedures stand out: The new Hilti BX 3-SCT stud driving method and the beam end tester.

Geohazard Mitigation: Why Shotcrete?

To improve safety and mitigate the risks of rockfall events along I-65 in Giles County, TN, GeoStabilization partnered with the Tennessee Department of Transportation and a local construction company.