March 2002, and May 2002. Work was conducted inside process vessels in a pulp mill by the specialized lining contractor, Canadians Stebbins Engineering Ltd., and the shotcrete contractor, Béton Projeté M.A.H. Due to operational constraints and significant costs involved with downtime, the contractors™ primary goal was to perform a repair that would provide long-term reliability within the shortest construction period possible.